31.5.08

'POLYPROPYLENE' issue

da polypropylene is really quite expensive n since v dun hv much budget left...hmm..so our final decision is using the sunturf corrugated..they are much cheaper compare to da polypropylene...n i can get it through bunnings by mahself...so no tym ta waste.....hmmmmm...
860 x 3600 mm x 2pieces
$34.2 x 2 = $68.4

cant wait to go to da workshop 2molo..to finish our lovely lil stage....loves it**



our new project cost table*

29.5.08

workshop session..

in process*

click here is c our portable stage on move* http://www.youtube.com/watch?v=B26NaLESivY

25.5.08

BUNNINGS aga

i went ta bunnings today aga..yes..is lyk an every week stuff...
i was lookin' fer paints today...the timber gloss vanish, and white paint, spray..also brushess..
n i realize the paint is expensiveeee....but v dint need ta use it at this stage..i fink i ll figure it out in another way(s)..


plywood (outside of the stage) - timber gloss vanish
plywood (inside) - paint white to get effective fer da lightings
folding stage - either a bucket of paint or spray..v r nah gna use a lot..since is juz one side.


hmm....keep finkin'*

23.5.08

plywood issue*

since the unforture order happens on thur...(the staff in da hardware store, made an wrong order fer us..which v wan 2 12m plywoods..n i hv no idea y she hears i wan a 1 15m plywood)...which left us a mess n v need ta pay a lil bit more fer a 15m plywoodd....n is $$$65$$$ omg....its deliver to us on monday..so i hv ta bak ta workshop ta pick dat up...hmmmm*


new project cost table is coming up**

21.5.08

SUPER SILLIE*

since i neva read da schedule....'
n i tho v r still hving class on bul 87..so dat i juz wen 87 juz on tym..n wen i open da doorr..no one was deree..how stupid...n diz is nah da 1st tym..annoying.....**

i missed the sign offff

omg i juz got austin msg...n i realize i missed the design sign off ll...
it was actually on this morning....omggggggg

20.5.08

project cost



finally finish prepare the project cost table for the design sign off fer 2molo..
afta getting quotes from different hardware retails n suppliers..
i finally figure to get almost all the materials from bunnings...

and here are the project cost*
still trying to find a way to get cheaper materials or delivery...the budget is 16 bux over right now...hmm..trying to reach the 450 bux wivout getting any xtra money from our pocket*

click to enlarge


16.5.08

design sign off 2molo

10.30am – Children’s vehicle
10.50am – Live music/stage vehicle
11.10am – Coffee vehicle
11.30am – Cooking vehicle
11.50am – Communications vehicle
12.10am – Information vehicle


wut v need fro 2molo*

project cost budget,
schedule of the model making
scenario
CAD drawing

15.5.08

material hunt*




click to enlarge

basically, in this week i hv been to few different hardware stores, n called up few different suppliers (timber n plastic)...

and i found out there are lots of difficulty when 'hunting' for the materials i need..

-for most of the suppliers as they said the juz do wholesale..so i got rejected from most of them....
-wen i found sumfink dat i need usually got out of stock..mayb they dun hv stock..
-also i hv to deal wiv the delivery issue, coz sum of the hardware store actually doing free delivery but they charged their item in a vy high price...so i wud hv to figure out..lyk if i found sumfinks dat is cheap/ reasonable price...but they charge approx.50 bux for delivery.. (n its depends on wut kind of car/truck/urt, n of coz da larger car cost more)...


8.5.08

class on elgin st*

live studio at 0507 carlton estate*
pin ups for the class, materials research,
materials mesaurement, CAD drawing,
instruction of how to use...
enlarge the pic by click it

6.5.08

confirming that tmrw Wed 7th our class will be held at:

Elgin Street Housing Estate

Artists room
Ground floor 20 Elgin StCorner of Elgin and between Canning & Nicholson St's
CarltonEnter off Elgin St,

The artists room is at the base of the red brick tower building,
Enter via fly screen door on northern wall of building., oppositecarpark.

2.5.08

GROUP MEETTING II


SPOTTED:GROUP MEETING AT 5/5 MONDAY 1300 BULD 87
THE MEETING FER TODAY IS ABOUT THE USE OF MATERIALS FOR OUR CONCEPTS AND TRYING TO GET THE BUDGET OF THE MATERIALS, HOW ARE THE CONCEPTS USE WIV HUMAN POWER..
AND TEH STUFFS V DO, HAVE TO SHOW ON WEDNESDAY, PIN UP AGA**SO HV TO CREATE NEW LAYOUT AGA..